I would have thought a tower crane meant long term building work going on ,controled demolition is normaly carried out but external machines with crunchers etc nowadays or internal you could use a robotic version running on 3 phase electric so no fumes from a petrol/diesel engine an example being a Brokk but not seen the site access so a tower crane may be the only access for removel of rubbish.